Time Fashion Limited custom product development space

OEM & ODM / Private Label

A defined route from concept to bulk production.

Use our private-label process for a new range, a focused team programme or an extension to an existing collection. Each stage ends with a practical approval point.

Development process

Seven checkpoints from brief to dispatch.

The sequence can be adapted to the product, but approvals should remain explicit.

01

Brief

Target user, product, quantity, price level, delivery window and destination.

02

Material direction

Available or custom fabric, components, colour and performance requirements.

03

Technical development

Measurements, pattern, construction, logo placement, trims and packaging plan.

04

Sample

Prototype production followed by fit, workmanship and appearance feedback.

05

Pre-production approval

Final sample, artwork, colour, labels, bill of materials and tolerances agreed.

06

Bulk production

Material control, in-line checks, finishing, measurement review and final inspection.

07

Pack & dispatch

Approved packaging, carton marks, shipping documents and freight coordination.

Your label, specified properly

Customisation choices coordinated as one product.

Product & fit

  • Custom measurement chart
  • Block and grading direction
  • Construction and seam choices
  • Women's, men's, unisex and children's sizing

Colour & branding

  • Fabric colour selection or custom dyeing
  • Embroidery, print, transfer and silicone applications
  • Woven, printed and heat-transfer labels
  • Custom zips, buttons, pullers and trims

Retail presentation

  • Hangtags and barcode labels
  • Custom polybags, pouches and boxes
  • Carton marks and packing ratios
  • Destination-specific documentation where scoped

MOQ & timing

Plan with realistic commercial inputs.

For many apparel programmes, the typical starting point is around 100 pieces per style and colour. Materials, custom dyeing, moulded components and packaging can require a higher minimum.

Initial samples are commonly planned in approximately 7–10 working days after material and artwork confirmation. Bulk timing is confirmed only after approvals, material availability, quantity and packaging are known.

Approval discipline

What protects the result.

One approved specification

Product measurements, construction, colour, artwork and packing details remain the reference for bulk.

Written change control

Any change affecting price, performance, appearance or timing is confirmed before implementation.

Market requirements scoped early

Testing, certification, labelling and documentation must be named in the brief and quotation.

Talk to our development team

Ready to define your first sample?

Send the clearest information you have. Our team will reply with the missing decisions, sample route and quotation inputs.